Removal of corroded line sections, installation of 6-inch seamless steam headers, engineered expansion loops, thermodynamic steam traps, and calibrated hydro-testing.

Client / Sector

[Confidential Industrial Client in Pakistan]

Location (Pakistan)

Sundar Industrial Estate, Lahore

Category & Scope

Industrial Piping

Execution Status

Maintenance Retainer

1. Client Requirement & Operating Challenges

Existing utility steam lines were experiencing thermal expansion vibration, water hammer, and energy losses across a 250-meter plant run.

2. Detailed Scope of Execution

Removal of corroded line sections, installation of 6-inch seamless steam headers, engineered expansion loops, thermodynamic steam traps, and calibrated hydro-testing.

3. Engineering Solution & Methodology

Re-engineered line gradients and strategically positioned condensate collection pots eliminated water hammer and reduced steam heat loss.

4. Verified Result & Project Delivery

Hydrostatic pressure test successfully held at 1.5x working pressure with zero leakage.

Key Resources: Duration: 4 Weeks | Team: 10 Certified Pipefitters & Welders | Materials: Seamless Carbon Steel ASTM A106 Gr B (Sched 40 & 80), Class 300 Flanges

Request Similar Project Execution

Discuss engineering requirements with our project team.

1. Contact
2. Project
3. Technical
4. Files
5. Consent

Step 1: Contact & Company Details

WhatsApp Quotation