Removal of corroded line sections, installation of 6-inch seamless steam headers, engineered expansion loops, thermodynamic steam traps, and calibrated hydro-testing.
Client / Sector
[Confidential Industrial Client in Pakistan]
Location (Pakistan)
Sundar Industrial Estate, Lahore
Category & Scope
Industrial Piping
Execution Status
Maintenance Retainer
1. Client Requirement & Operating Challenges
Existing utility steam lines were experiencing thermal expansion vibration, water hammer, and energy losses across a 250-meter plant run.
2. Detailed Scope of Execution
Removal of corroded line sections, installation of 6-inch seamless steam headers, engineered expansion loops, thermodynamic steam traps, and calibrated hydro-testing.
3. Engineering Solution & Methodology
Re-engineered line gradients and strategically positioned condensate collection pots eliminated water hammer and reduced steam heat loss.
4. Verified Result & Project Delivery
Hydrostatic pressure test successfully held at 1.5x working pressure with zero leakage.