Projects & Industrial Case Studies
A track record of structural steel fabrication, plant machinery erection, high-pressure utility piping, and shutdown turnaround contracts executed across Pakistan.
Pulse-Jet Baghouse Dust Extraction System Installation
Airborne sawdust from multiple high-speed sanding and cutting lines was polluting factory air and creating safety hazards.
Read Case Study →72-Hour Scheduled Plant Shutdown Turnaround Maintenance
The factory had a strict 72-hour window during plant annual shutdown to replace worn rotary steam joints, overhaul cooling water pumps, and…
Read Case Study →Field Assembly of 50,000-Liter Industrial Fuel Storage Tanks
Bulk fuel storage capacity was insufficient for winter energy backup, and road access restricted transport of fully assembled tanks.
Read Case Study →Heavy Machinery Rigging & Precision Laser Alignment
Imported multi-stage compressor and heavy slurry pump skids needed un-crating, indoor positioning, and precision alignment onto new concrete plinths.
Read Case Study →High-Pressure Steam Header & Utility Piping Loop
Existing utility steam lines were experiencing thermal expansion vibration, water hammer, and energy losses across a 250-meter plant run.
Read Case Study →120-Ton Industrial Mezzanine & Exhaust Ducting Installation
The client required additional heavy storage and equipment support space above an active production floor without halting machine operations.
Read Case Study →