72-Hour Scheduled Plant Shutdown Turnaround Maintenance – kashifengineering.com
PROJECT CASE STUDY • M-3 Industrial City, Faisalabad

72-Hour Scheduled Plant Shutdown Turnaround Maintenance

HomeProjects72-Hour Scheduled Plant Shutdown Turnaround Maintenance

Round-the-clock 12-hour rotating shifts for mechanical dismantling, pump bearing replacement, steam valve renewal, and chute hardox liner welding.

Client / Sector

[Confidential Industrial Client in Pakistan]

Location (Pakistan)

M-3 Industrial City, Faisalabad

Category & Scope

Plant Maintenance

Execution Status

Maintenance Retainer

1. Client Requirement & Operating Challenges

The factory had a strict 72-hour window during plant annual shutdown to replace worn rotary steam joints, overhaul cooling water pumps, and repair structural chutes.

2. Detailed Scope of Execution

Round-the-clock 12-hour rotating shifts for mechanical dismantling, pump bearing replacement, steam valve renewal, and chute hardox liner welding.

3. Engineering Solution & Methodology

Staged all prefabricated spools and replacement parts on-site prior to shutdown initiation for zero waiting time.

4. Verified Result & Project Delivery

Complete scope executed in 68 hours—allowing 4 hours of pre-startup testing before production resumption.

Key Resources: Duration: 72 Hours (Round-the-Clock) | Team: 24 Multi-Shift Technicians | Materials: Spiral Wound Gaskets, Stainless Steel Pipe Spools, High-Grade Fasteners

Request Similar Project Execution

Discuss engineering requirements with our project team.

1. Contact
2. Project
3. Technical
4. Files
5. Consent

Step 1: Contact & Company Details

WhatsApp Quotation