Field Assembly of 50,000-Liter Industrial Fuel Storage Tanks – kashifengineering.com
PROJECT CASE STUDY • Sheikhupura Industrial Corridor

Field Assembly of 50,000-Liter Industrial Fuel Storage Tanks

HomeProjectsField Assembly of 50,000-Liter Industrial Fuel Storage Tanks

Shop plate rolling and edge beveling, transport of curved shells, on-site tank bottom welding, shell jacking, roof conical truss fitment, and hydro-testing.

Client / Sector

[Confidential Industrial Client in Pakistan]

Location (Pakistan)

Sheikhupura Industrial Corridor

Category & Scope

Storage Tanks

Execution Status

Maintenance Retainer

1. Client Requirement & Operating Challenges

Bulk fuel storage capacity was insufficient for winter energy backup, and road access restricted transport of fully assembled tanks.

2. Detailed Scope of Execution

Shop plate rolling and edge beveling, transport of curved shells, on-site tank bottom welding, shell jacking, roof conical truss fitment, and hydro-testing.

3. Engineering Solution & Methodology

Field erected using certified multi-pass submerged arc and manual welding procedures with thorough root-pass dye penetrant inspection.

4. Verified Result & Project Delivery

24-hour hydrostatic water fill test passed with 100% weld integrity.

Key Resources: Duration: 5 Weeks | Team: 12 Welders & Fitters | Materials: Mild Steel Plates (6mm - 10mm), ASTM A36, Structural Steel Cage

Request Similar Project Execution

Discuss engineering requirements with our project team.

1. Contact
2. Project
3. Technical
4. Files
5. Consent

Step 1: Contact & Company Details

WhatsApp Quotation