Shop plate rolling and edge beveling, transport of curved shells, on-site tank bottom welding, shell jacking, roof conical truss fitment, and hydro-testing.
Client / Sector
[Confidential Industrial Client in Pakistan]
Location (Pakistan)
Sheikhupura Industrial Corridor
Category & Scope
Storage Tanks
Execution Status
Maintenance Retainer
1. Client Requirement & Operating Challenges
Bulk fuel storage capacity was insufficient for winter energy backup, and road access restricted transport of fully assembled tanks.
2. Detailed Scope of Execution
Shop plate rolling and edge beveling, transport of curved shells, on-site tank bottom welding, shell jacking, roof conical truss fitment, and hydro-testing.
3. Engineering Solution & Methodology
Field erected using certified multi-pass submerged arc and manual welding procedures with thorough root-pass dye penetrant inspection.
4. Verified Result & Project Delivery
24-hour hydrostatic water fill test passed with 100% weld integrity.
Key Resources: Duration: 5 Weeks | Team: 12 Welders & Fitters | Materials: Mild Steel Plates (6mm - 10mm), ASTM A36, Structural Steel Cage